SP Group Instructions
Procedure
Step 2) Choose the 'SPWebsite (without GST)' Tab and input the most recent month and the 2 following on the 'Month' column on the spreadsheet. Input the year on the 'Year' column accordingly
Step 3) Check the value of the most recent period column and the 'HIGH TENSION LARGE (HTL) SUPPLIES → Peak period (7.00am to 11.00pm)' line. IT IS THE VARIABLE 'A' ON THE EQUATION ON STEP 6
Step 4) Check the value of the most recent period column and the 'HIGH TENSION LARGE (HTL) SUPPLIES → Off-peak period (11.00pm to 7.00am)' line**. IT IS THE VARIABLE 'B' ON THE EQUATION ON STEP 6**
Step 5) Calculate the sum C = (16A + 8B)/24
Step 6) Input the resulting number 'C' value on the Value 1 column
Below is just an example for the data in the prints above
Step 7) Repeat the procedure step 1) trough step 6) for the previous quarter in the spreadsheet (the previous column).