Guru's Verification engine ensures consistency, confidence, and trust in the knowledge your organization shares. Learn more.

Ender 3: Bed Insulation

Before doing this install, install Vibration Dampers first.

Also see Bed Insulation

  1. Remove the Bed Leveling Screws.
    image.png
  2. Remove the Springs under the Bed.
    image.png
  3. If you are using materials you sourced yourself, cut a peace of material out the size of the bed.
  4. flip the bed over and push the material into the screws for the bed
  5. Cut a section out to allow for the cables that go into the bed.
    image.png
  6. if the screws did not go through full, use the largest Allen wrench that came with the ender to push fully though.
    image.png

Supporting Documentation

Videos:

Articles:

Image

You must have Author or Collection Owner permission to create Guru Cards. Contact your team's Guru admins to use this template.